Wakefield Fire Station – Wakefield

Project Details

Wakefield Fire Station – Wakefield

Using Calima R UGR<19 Recessed Fittings, a Full Lighting and Controls design with an emergency 🆘 override on, of the Flex 7 control system using the fire panel #lightingdesign #firestation #flex7 #lightingcontrol #lightingconsultant

Flex7 Ltd Northcliffe Lighting Limited Colin Shockledge

UR-EKA LIGHTING AND CONTROLS LTD - The North's leading Distributor of Commercial and Architectural Lighting and Lighting Control Systems
  • Client: Murray Building Services Ltd
  • Date: June 2020
  • Location: Wakefield, Yorkshire
  • Lighting: Recessed Calima R UGR<19 Panels, Crux Downlights, complete with a full Flex 7 Lighting control systems to override the lights on when the Fire Panel is activated
  • Company URL: Murray Building Services
UR-EKA LIGHTING AND CONTROLS LTD - The North's leading Distributor of Commercial and Architectural Lighting and Lighting Control Systems

Project Gallery

Other Projects